1. CGC Jilin Longhua Baicheng Th制聽ermal Power Plant Expans窗吃ion Project


Baicheng Thermal Power Pla服那nt 2 × 200MW Expansion Pro黑飛ject is a state-level power statio厭上n construction project 麗習during the "Eleventh Five-Year"腦是 period, and was officially approved熱友 by the National Development an那金d Reform Commission on A人視ugust 7, 2009. After being put into op兵家eration, the plant can provide power f開說or urban heating area of 6.6 million 看她square meters, industrial 東校heat load of 116 tons /兵雜 hour and annual generat的自ing capacity of 2.1 billion 樂哥kwh, playing an important role in impr國書oving urban heating capaci訊弟ty and energy efficie是頻ncy. 

 

Jinguan Electric adopts lo也日ng service life electrical switch,一都 arc light complete protection長鐵 device, microcomputer protection dev從下ice, microcomputer harmonic elim厭黃ination device, “five-preve資樹ntion” device technology, differ舊短ent types of load over-voltage prote輛村ction devices and other樹就 high-voltage switch equipmen拍河t to provide safe and rel店現iable operation of the solution for分中 energy power system. Jinguan E司有lectric provided a 腦事hybrid 6 kV metal armored 動長switchgear cabinet consisting 湖學of vacuum circuit breaker sw區友itchgear and F-C cir房秒cuit switch cabinet whic麗了h is safe and reliable since輛風 being put into operatio長科n.  

 

2. CGC Ningxia Yingl做分ite Ningdong Power Plant P件道roject

 

CGC Ningxia Yinglite Ningdong 厭腦Coal-based Chemical Co., Ltd. 畫懂is a wholly-owned subsidiary of 可年CGC Yinglite Group. 鐘開It is a platform for inve制話stment, construction and operat舞朋ion management of CGC還她 Yinglite Group in Ningxia Ningdong 去和 Energy Chemical Base. Of which, 2新做 × 330MW cogeneration project 錯兒is one of seven projects.

 

Jinguan Electric provided 個舞a complete set of high and紅紙 low voltage switchgear solutions for就道 2 × 330MW units cogen還照eration project, including 126 窗日sets of 6kV high vol討校tage switchgears and 現放209 sets of 0.4kV low voltage switchgea窗關rs. The program has been successfu和購lly operated in this project,動一 marking that Jinguan Electric ha舊鄉s the ability of undertaking西呢 large energy power generation syst是道em switching equipment 麗頻project.

 

3. CGC Chifeng 3052 市厭Coal-Made Urea Project

 

CGC Chifeng Chemical Co., Ltd. is a w務花holly-owned subsidiary of CGC Inne離化r Mongolia Energy Co., Ltd. 東能It is one of the coal comprehen白外sive development projects o工海f China Guodian Corporation c銀懂arried out in Chifen黃船g City, Inner Mongolia. 場她The first phase of the project (CGC C金身hifeng 3052 Coal Urea費畫 Project) started construct樂廠ion in April 2009 with a total inv弟刀estment of CNY 3.3 billion. The project錯劇 has been listed as a national key 個科 industry revitalization a湖答nd technological transformation projec線街t.


Jinguan Electric provided the co車明mplete set of medium 銀讀voltage metal-clad switchgear 10kV聽人 system solution for the main substa窗數tion of the project. It ad知光opted main inlet cabinet商說, outlet cabinet, capacitor outl答懂et cabinet, busbar PT / arres相習ter cabinet, outlet cabine錯司t for substation, sub-section and bus物山 coupler cabinet, closed bus bridge an頻紅d MHK three-phase five-pole direct-indu謝光ctance type arc-suppression coil cab美多inet and other complete sets forming a用科n electrical plan for multiple又黃 purposes. 10 kV equipment pr錢理otection monitoring technology,能們 automatic tracking compensatio空好n arc suppression coil co影河mplete equipment technol還相ogy, switchgear five-preventio店著n device technology,兒男 and a full range of factory in身店spection technologies are also used to 身店meet the conditions of equip會高ment use, technical para城有meters, structure, performance都腦, testing and other technical req水國uirements.


4. Hadashan Water Control 多北Project, aWater Source Project of 章資North-To-South Water Diversion購開 Project


 
Hadashan Water Control Project林外 is one of the water sou都知rce projects of North-To-South Wat麗員er Diversion Project The constru影答ction of Hadashan Water Control Project資信 is an urgent need for regional還答 economic development and the natu個嗎ral ecological environme一拍nt in the western Jilin Province.就見 It has a positive effect on impro北歌ving the flood contro東說l standards of Songyuan City a間上nd reducing the peak of the Songhua算愛 River. It is built to solve制光 the drought and water shortage i下微n the western region of Jilin and to 子機control flood on the Second Songhuaji山對ang River. It is also built as a wat但老er source project of North-To-Sout外熱h Water Diversion Project. The Hada林現shan Water Control Project 錯老has comprehensive benefits理文 such as water supply, irrigat如視ion, flood control, power generatio高朋n, shipping and environmental water u跳好se.

 

Jinguan Electric provided a full rang謝河e of automation control solution報刀s for this project. Advanced d廠習rawer cabinet plan and advanced process紅對 technology are adopted by筆自 Jinguan Electric to provide custom工知er with high-quality l行市ow-voltage switchgear, which is 坐水stable and reliable since its op樹有eration.