Group News
Home > News > Group News > Details
Jilin Jinguan Electric Co.,畫城 Ltd. C-GIS Intelligen報站t Ring Main Unit Const朋少ruction Project 費票
Released on: 2013-10-24 Co湖學ntent Sources: Jinguan Electric 低如

Jilin Jinguan Electric Co., Ltd. 聽能C-GIS Intelligent Ring Main 呢照Unit Construction Proj票化ect


Industry: Others


Bind Type: Domestic 關公bid


Source of fund: Others討地


Region: Jilin


Biding project number: CCDG2014Z0空高12


I. Bid Invitation Co看輛nditions


This bidding project, i.e. Jilin微遠 Jinguan Electric Co., Ltd. C-GIS Int開鐵elligent Ring Main Unit C低街onstruction Project has b舞年een approved by C.S.短劇K.J.Z. [2014] No. 11 Docume務麗nt. The Owner and bid 紙見inviter of the project is Jili空弟n Jinguan Electric Co., Ltd., and con鐵話struction fund is raise吃快d by the enterprise. The P都村roject has met with the bidding con慢新ditions and is now launching pu通笑blic bidding for the construction 能但of this Project.


II. Project Overview and Bidding Sco照區pe


2.1 Bidding content: Jilin Jinguan Electric日頻 Co., Ltd. C-GIS intelligent 門民ring main unit construction proj作姐ect;


Bidding scope: Const術冷ruction of production 城知plants and warehouses;


Total building area: 10176 媽他m2;


2.2 The construction site is Changchun 草什Shuangyang Economic Develo裡關pment Zone;


2.3 The planned commencement date is May能個 15, 2014, the planned completion d學美ate is November 30, 201懂水4, and the construction peri煙妹od is 200 calendar days.


2.4 Project quality is requi懂訊red to meet the criteria 不拍of acceptability.


III. Qualification requirements o的校f the Bidder


3.1 The applicant must be a legal pe腦厭rson or organization w城動hich has Grade B qualification (or abo低人ve) building construction engi林黑neering construction general contractor人地 approved and issued照一 by  construction 工村administrative department i花們n charge and a safety 我風production license (copy) and sh動業ould have corresponding constr了討uction ability in terms of perso到計nnel, equipment, funds and other a雪能spects.


3.2 The project manager or registered暗間 constructor proposed to 錢視be dispatched by the bidder sho麗的uld have a Registered Associate 和紙 Constructor license or above appro看玩ved and issued by construction admi就兵nistrative department in charge.知聽


3.3 Project management person筆兵nel proposed to be dispatche書秒d by the bidder should 書到not engage in other construction 都新in progress. Otherwise t什紙he bidder will be treate關刀d as an abandoned bidder.章北 The project manager or regis動嗎tered constructor of the winni作劇ng bidder should, after bid wining, ha站小ndle registration procedure to the文說 department in charge of project湖黃 bidding.


3.4 Joint bidding will n制師ot be accepted.


IV. Acquisition of bidding documen在小ts


4.1 Those who wish to participate in the 湖熱bidding should purchas歌高e the bidding document b知和y presenting business 錢大license, enterprise quali得聽fication certificate, saf會地ety production license and lett店舊er of recommendation from April 書得8, 2014 to April 14, 2014 (statutor到現y holidays excluded) from 8:30 to票飛 11:30 and 13:30 to 16:00 (Beijing 樹城time, the same below).


4.2 The bidding document is匠做 priced at 1,500 yuan per set and is n農又ot returnable.


V. Submission of Bids 


5.1 The deadline for submission of bid (bi遠間dding deadline, the s雜微ame below) is 13:30,笑可 May 6, 2014.


5.2 Late delivery or bids no身妹t delivered to the designat到冷ed location shall not be accep空從ted.


5.3 In submitting the bid, the bidder shall技要, in accordance with空火 the relevant provisions, provide not議國 less than CNY 10,000間國 as bid bond or bid guarantee.


5.4 If there are less than t長看hree valid bidders, the服冷 bid inviter shall organize the b鄉城idding separately.


5.5 When effective bid pri離雨ce of the bidder exceeds the control樂筆 price set by the bid務分 inviter, the bid pric暗愛e shall be treated as invalid.